Letter from November 2025:
ln 2022, we worked with FLSmidth, now Fuller Technologies, to study the replacement of our kiln outlet seal, as well as the kiln outlet shell and nose ring. The contract between Vicat La Grave de Peille and FLSmidth Cement included the supply and installation of the entire assembly.
The installation work took place between November and December 2023 under the supervision of two FLSmidth specialists.
Despite difficulties related to transporting the parts to the factory, the delivery and installation deadlines were met.
The outlet seal installed is the latest model supplied by Fuller, graphite seal version 2.0, with improvements to the individual graphite plate cassette fastenings to eliminate the cable tensioning system.