Trust and expertise
Fuller has a strong and long-lasting relationship with Cementos Molins and was the main equipment supplier for the Sant Viçent dels Horts plant. Apart from having close knowledge of the plant, we also share the company’s sustainability ambitions and were called in to discuss this hot gas generator replacement project from the outset. This, in combination with our extensive capabilities and equipment knowhow, made us the natural choice of partner for this turnkey project, which was initiated in July 2020.
Having first participated in the process and engineering layout and design, once the contract was agreed our scope expanded to include equipment, engineering, programming of the relevant control systems, and commissioning. The range of equipment included cyclones, gas control valves, fan, ducting and sensors.